← All News
ConflictsAugust 12, 2026· USNI News

Report to Congress on the MQ-25 Stingray

The following is the Aug. 12, 2026, Congressional Research Service report, MQ-25 Stingray: Background and Issues for Congress. From the Report The U.S. Navy is developing a carrier-based uncrewed aircraft system (UAS) to perform aerial refueling and intelligence, surveillance, and reconnaissance (ISR) missions. The MQ-25 Stingray, if the system is fielded as planned, would be the U.S. Department of Defense’s (DOD’s) first uncrewed tanker and the Navy’s first carrier-based uncrewed aerial vehicle (UAV, or drone). (DOD is “using a secondary Department of War designation,” under Executive Order 14347 dated September 5, 2025.) Congress has expressed an interest in the Navy’s

The following is the Aug. 12, 2026, Congressional Research Service report, MQ-25 Stingray: Background and Issues for Congress.

From the Report

The U.S. Navy is developing a carrier-based uncrewed aircraft system (UAS) to perform aerial refueling and intelligence, surveillance, and reconnaissance (ISR) missions. The MQ-25 Stingray, if the system is fielded as planned, would be the U.S. Department of Defense’s (DOD’s) first uncrewed tanker and the Navy’s first carrier-based uncrewed aerial vehicle (UAV, or drone). (DOD is “using a secondary Department of War designation,” under Executive Order 14347 dated September 5, 2025.) Congress has expressed an interest in the Navy’s efforts to develop a carrier-based drone and in the future structure of the carrier air wing.

According to the Navy’s FY2027 budget submission to Congress, by providing the carrier air wing with a dedicated aerial tanker, the MQ-25 would extend the effective operating range of crewed fighter aircraft and reduce the strain on fighter aircraft modified to provide mid-air refueling capabilities. In congressional testimony, Navy officials have further described the Stingray as a “pathfinder” to what they describe as the “air wing of the future”—one in which UAVs could potentially conduct various missions.

For FY2027, the Navy requested $1.75 billion in discretionary procurement and research, development, test, and evaluation (RDT&E) funding for the MQ-25. If approved by Congress, the Navy’s FY2027 request would fund the procurement of three MQ-25 aircraft and represent the second year of low-rate initial production (LRIP) of the aircraft. The MQ-25 program of record currently estimates a total of 76 aircraft, including 67 operational aircraft and nine test and developmental aircraft.

Download the document here.

Captain Liberty
Online nowAsk Captain Liberty