← All News
ConflictsAugust 13, 2026· DVIDS

Powering Dry Dock 5 (P-209): Partnerships build infrastructure for future operations

The path to powering Dry Dock 5 does not begin or end at the waterfront. It extends across Joint Base Pearl Harbor-Hickam through utility poles and overhead lines, then continues underground through conduits and cables.

The path to powering Dry Dock 5 does not begin or end at the waterfront. It extends across Joint Base Pearl Harbor-Hickam through utility poles and overhead lines, then continues underground through conduits and cables.

Captain Liberty
Online nowAsk Captain Liberty